Media Centre

View our Case Studies

Henley Case Study
Henley Case Study

Aiding what is thought to be the largest monitored frogs and toads population in the UK, 250 metres of ACO Technologies’ One-Way Fence ...

Download PDF
Fabian Way
Drainage Solution on A483

As part of the wider A483 Fabian Way dual carriageway improvements, ACO Technologies was tasked with alleviating a recurring road flooding ...

Download PDF
Silvertown Tunnel

Silvertown Tunnel – a new tunnel highway under the River Thames help eases congestion in London. Designated as a Nationally Significant ...

Download PDF
Toneway Junction: The Road to High Capacity

ACO provides an optimised drainage solution that still catered for the high-capacity requirements present within an urban highway environment.

Download PDFVIEW WEB PAGE
Wildlife Climate Tunnel Castle Hill
ACO Wildlife Climate Tunnel provides perfect ecological solution at Castle Hill project in Ebsfleet Valley

ACO Climate Tunnels were specified in order to support the ethos of the new Garden city and protect the local wildlife

Download PDF
Top